Construction Planning and Management MCQs -2 | Civil Engineering MCQs | Competitive Exams
1. Mile stone chart is an improvement over ______. Bar chart OPST scheduling CPM Scheduling PERT scheduling Answer: Option A…
1. Mile stone chart is an improvement over ______. Bar chart OPST scheduling CPM Scheduling PERT scheduling Answer: Option A…
1. Preliminary project report for a road project must contain ______. The detailed estimated cost based on detailed design The…
1. For pre-tensioned prestressed concrete, the grade of concrete shall be not less than M30 M40 M60 M50 Answer: Option…
1. As per IS 456, the minimum cover to be provided for columns is 50 mm 25 mm 40 mm…
1. As per IS 456:2000, minimum period before striking form work for vertical surface of the columns _____. 1 days…
1. Uniformly distributed load on a concrete beam can be effectively counterbalanced by selecting _____. Concentric cable Eccentric cable Parabolic…
1. The maximum deflection due to load in RCC beams in buildings is limited to _____. Span/100 Span/250 Span/350 Span/500…
1. A doubly reinforced beam is considered as less economical as compared to a singly reinforced beam because _____. The…
1. The maximum percentage reinforcement in beam shall not exceed of cross-sectional area as per IS:456. 2.00% 0.15% 4.00% 0.12%…
1. Maximum area of compression reinforcement for beams is _____. 0.04 bD 0.85bd/fy 0.1 percent of web area 0.5 percent…