Construction Planning and Management MCQs -10 | Civil Engineering MCQs | Competitive Exams
1. The volume of soil to be excavated in its in-place natural state is called _____. Compacted cubic meter Basic…
1. The volume of soil to be excavated in its in-place natural state is called _____. Compacted cubic meter Basic…
1. If an activity has its optimistic, most likely and pessimistic times as 2, 4 and 9 respectively, then its…
1. The full form of PERT method of project network analysis is ______. Project Estimation and Review Technique Programme Evaluation…
1. In time-cost optimization of a project, crashing is done _____. on all the activities on original critical activities and…
1. The reduction in project time normally results in: Increasing the direct cost and decreasing the indirect cost Decreasing the…
1. Interfering float is the difference between _____. Total float and independent float Total float and free float Free float…
1. A ____ is similar to an activity but it does not consume any resources. Dummy Event Slack None of…
1. The system of organization introduced by F.W. Taylor is known as _____. Effective Organization Functional Organization Line Organization Line…
1. Mile stone chart is an improvement over ______. Bar chart OPST scheduling CPM Scheduling PERT scheduling Answer: Option A…
1. Preliminary project report for a road project must contain ______. The detailed estimated cost based on detailed design The…