Irrigation Engineering MCQs 11 | CIVIL ENGINEERING COMPETITIVE EXAMS
1. Finally formed berms in canals are provided for ______. Protection of banks erosion by the waves Control of seepage…
1. Finally formed berms in canals are provided for ______. Protection of banks erosion by the waves Control of seepage…
1. Which of the following is probably the most widely used for river training works? Spurs Check dams Aqueduct Apron…
1. Sand drains are used to _____. Reduce settlement Accelerate consolidation Increase permeability Transfer load Answer: Option B 2. Meandering…
1. Uplift on the base is not an important design factor in case of _____. Arch dams Gravity dams Earthen…
1. In Gravity dam, the factor of safety against overturning should not be less than _____. 1.15 1.5 1.8 2…
1. What type of cross drainage work is provided when the canal runs below the river? Aqueduct Level crossing Super…
1. Silt charge is defined as _____. Average size of silt particle Volume of silt particles flowing with unit volume…
1. According to Kennedy, non-silting and non-scouring velocity is called _____. Optimal velocity Critical velocity Mean velocity Average velocity Answer:…
1. Permanent wilting point moisture content for a crop represents the _____. hygroscopic water capillary water field capacity water water…
1. In estimation of the crop water requirements, the delta of a crop is expressed in ____ unit. Hectare pre…