Hydrology MCQs – 14 | GATE | ESE | GPSC | CIVIL ENGINEERING COMPETITIVE EXAMS
1. Standard Project Flood for the drainage area involved is the flood that is sure to be equalled in magnitude…
1. Standard Project Flood for the drainage area involved is the flood that is sure to be equalled in magnitude…
1. The hydrologic flood routing uses continuity equation only momentum equation only both continuity and momentum equations energy equation only…
1. The use of the unit hydrograph for estimating floods is limited to catchments of size less than 50 km²…
1. Runoff increases with increase in the infiltration capacity increase in intensity of rain increase in permeability of soil decrease…
1. Atmometer is used to measure ____. Evaporation Transpiration Evapotranspiration All of the above Answer: Option A 2. The Bowen…
1. Which of the following statement(s) is/ are correct? (i) Normal ratio method is used for estimating missing annual precipitation…
1. How many additional rain gauges are required in a catchment, if the error allowed in estimation of mean rainfall…
1. Floats are used to measure Discharge of stream Velocity of stream Flood discharge Afflux Answer: Option B 2. Under…
1. An isobar is a line which connects all points below the ground surface at which ____. The local ground…
1. Rise of water table above the ground surface ____. Equal increase in pore water pressure and total stress Equal…