Construction Planning and Management MCQs -6 | Civil Engineering MCQs | Competitive Exams
1. The reduction in project time normally results in: Increasing the direct cost and decreasing the indirect cost Decreasing the…
1. The reduction in project time normally results in: Increasing the direct cost and decreasing the indirect cost Decreasing the…
1. Interfering float is the difference between _____. Total float and independent float Total float and free float Free float…
1. A ____ is similar to an activity but it does not consume any resources. Dummy Event Slack None of…
1. The system of organization introduced by F.W. Taylor is known as _____. Effective Organization Functional Organization Line Organization Line…
1. Mile stone chart is an improvement over ______. Bar chart OPST scheduling CPM Scheduling PERT scheduling Answer: Option A…
1. Preliminary project report for a road project must contain ______. The detailed estimated cost based on detailed design The…
1. For pre-tensioned prestressed concrete, the grade of concrete shall be not less than M30 M40 M60 M50 Answer: Option…
1. As per IS 456, the minimum cover to be provided for columns is 50 mm 25 mm 40 mm…
1. As per IS 456:2000, minimum period before striking form work for vertical surface of the columns _____. 1 days…
1. Uniformly distributed load on a concrete beam can be effectively counterbalanced by selecting _____. Concentric cable Eccentric cable Parabolic…